This path is currently passable.
The river’s 1.39 m below the level where parts of this path can start to flood.
Over the past year, though, the river topped the level where we expect this path to flood properly on about 2 days, mostly in November to December.
River level at the gauge
1.31 mASDmeasured
River Severn at Welsh Bridge · 517 m away
See Environment Agency’s own readings for this gauge
Estimated flood lines: parts can start to flood at 2.70 mASD · properly flooded above about 3.55 mASD
The river’s around the middle of this gauge’s usual range.
Based on this gauge’s history, not yet on reports from this path. Yours would help.
Through the year
Month by month, the river reached the level where parts of this path can start to flood on about 6 days.
It went over the flood line once and stayed over for about a day.
From this gauge’s own record over the year to November 2026, measured against the level we estimate this path floods at. It’s a guide to the season, not a forecast.
About this path
Tarmac towpath around the Severn loop through Quarry Park, past Theatre Severn to the Frankwell footbridge — Shrewsbury's main riverside circuit. The council gates it shut whenever the Welsh Bridge gauge is forecast above 1.6 m, and did so in January 2023 and January 2024; the theatre sections follow at 2.4 m.
Been down today?
A few seconds of local knowledge keeps this honest for everyone. No account needed.
From people on the ground
No reports yet. If you’ve been down, you’d be the first.
Flood Path is advisory and not safety-critical — river readings come from public feeds with no guarantee, and conditions can change fast in heavy rain. Use your own judgement on the day.